Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Constructing the Roadway Improvements (Southbound Right Turn Lane Addition and Northbound Left Turn Lane Extension) RFP
Work includes 450 LF removing curb, 1,050 CY unclassified excavation, 725 CY borrow excavation (loose truckbed measurement)(a2 or better), 8 rbst roadbed processing, 1,511 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness, 1,511 SY bituminous treatment a, 315 gal tack coat, 377 SY planing existing pavement (approx 1.10" thru 2.0" thick), superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d 150 ton, superpave bituminous concrete wearing surface layer, patching, 1/2" maximum aggregate size mix, esal range c/d 25 ton. See attached file.
