School DistrictWV
Posted
Oct 9, 2026
Nov 9, 2026
Fairplains Demolition Project RFP
Work shall include, but not be limited to the following: Abatement and demolition of the Elementary School building and prepare the site for future development.
Description: Project consists of asbestos abatement, lead paint abatement, and demolition work.
City · IA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
School DistrictWV
Posted
Oct 9, 2026
Nov 9, 2026
Work shall include, but not be limited to the following: Abatement and demolition of the Elementary School building and prepare the site for future development.
CityWY
Posted
Oct 13, 2026
Nov 10, 2026
Project is to complete regulated full demolition of the structure, followed by proper disposal of all asbestos-containing materials (ACM), lead-paint and other regulated demolition debris.
CityGA
Posted
Sep 28, 2026
Oct 29, 2026
Work includes demolition and replacement of sidewalks; extraction of memorial stamped bricks without breakage and re-installing these memorial bricks in the newly constructed sidewalks in the same location as their original placement; hauling and lawful disposal of all demolition debris; grading, compaction, and base preparation; installation and finishing of new concrete sidewalks using GDOT standards; installation of americans with disabilities act (ADA)-compliant curb ramps; installation of concrete ADA-compliant handicapped ramps as specified; installation of aluminum handrails as specified; restoration and cleanup of all disturbed areas; and traffic and pedestrian control necessary to complete the work safely.
Melbourne Orlando International Airport
Special DistrictFL
Posted
-
Oct 20, 2026
Demolish and clear the classroom and hangar buildings.
Decision makers connected to this RFP from City of Newton.