CityFL
Posted
Sep 24, 2026
Oct 29, 2026
Description: Work includes construct approximately 2,540 LF of 6" PVC water main, 1,450 LF of 10" PVC/FPVC (conventional installation/directional bore) water main, fire hydrants, associated appurtenances, cutting and capping existing mains; reconnection of existing water services; connection to existing mains; and associated restoration.
City · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Umatilla.
Adjacent opportunities open for bidding right now.
CityFL
Posted
Sep 24, 2026
Oct 29, 2026
Work includes construct approximately 2,540 LF of 6" PVC water main, 1,450 LF of 10" PVC/FPVC (conventional installation/directional bore) water main, fire hydrants, associated appurtenances, cutting and capping existing mains; reconnection of existing water services; connection to existing mains; and associated restoration.
Posted
Sep 29, 2026
Oct 21, 2026
The project will reconstruct existing roadways to allow two travel lanes, one two-way left turn lane, and bike lanes. Other work includes replacement of curb and gutter, construction of sidewalks with tree wells, LED pedestrian and street lighting, upgrade of storm drainage, joint utility trench, upgrade to watermain, upgrade of curb ramps to ADA guidelines, and modifications/upgrading of traffic signals including installation of accessible pedestrian push buttons and installation of optical fiber and connection.
Central Macoupin Co Rural Public Water Dist
Special DistrictIL
Posted
Sep 8, 2026
Oct 16, 2026
To construct approx. 30,000lf of finished water transmission main and appurtenances. This contract includes but is not limited to the following items of work, which are listed for the convenience of the contractor in understanding the intended scope of work: 1. Site work, including excavation, fill, compaction, subgrade preparation, clearing and grubbing. 2. 325 LF Directional boring. 3. 325 LF Bore and jack 4. Clean up, fertilize, ripping, final grading 5. Water and fiber optic line installation with related appurtenances.
Posted
Sep 28, 2026
Oct 15, 2026
Project consists of the removal and replacement of approx 145 FT of 4" C-900 DR-18 PVC water pipe; 100 LF of 2-Inch PVC Pipe with 4-Inch C-900 DR-18 PVC Pipe at 6-ft Bury Depth (Well No. 2 to Well Pump House).