CountyAL
Posted
Jun 27, 2026
Oct 15, 2026
Description: Project consists of, but is not limited to, dewatering, excavation as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, pcc sidewalks, railing replacement, site lighting, and seeding.
HigherEducation · IA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Iowa State University.
Adjacent opportunities open for bidding right now.
CountyAL
Posted
Jun 27, 2026
Oct 15, 2026
The project consists of the new construction of the bait shop with parking, a utility setup for food trucks, the installation of the fish cleaning station, and a new main entrance gate to the lake with new signage.
OtherME
Posted
Dec 3, 2025
Oct 27, 2026
The project consists of renovations to an existing building with the construction of ballistic-rated glazing, ballistic-rated wall panels, ballistic-rated doors and frames, doors and frames, gypsum drywall, exterior concrete steps, metal fencing with electronic access controls, and modifications to electrical systems to accommodate these renovations. Site work will be limited to excavation, backfill, loam and seed at fence and step installation.
Special DistrictMN
Posted
Mar 31, 2026
Oct 19, 2026
Lobby improvements for safety and security upgrades.
CityOK
Posted
Jul 7, 2026
Oct 22, 2026
1 LS Chlorination system improvements.