North Carolina Department of Adult Correction
State AgencyNC
Posted
Sep 22, 2026
Nov 5, 2026
Mountain View Boiler Replacement RFP
Work includes boiler replacement.
Description: Work includes to upgrade and expand its existing network infrastructure using equipment compatible with their current extreme networks environment. The project includes network switches, WAPs, rack-mounted ups united, licensing and install/configuration. WAPs will include installation in a greenhouse location with all equipment properly installed and tested.
SchoolDistrict · AR, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
North Carolina Department of Adult Correction
State AgencyNC
Posted
Sep 22, 2026
Nov 5, 2026
Work includes boiler replacement.
CountyMO
Posted
Oct 14, 2026
Nov 11, 2026
Work includes repair of the road using a contractor furnished, engineered soil retaining system such as an MSE wall.
CityAZ
Posted
Oct 13, 2026
Nov 23, 2026
Work includes removal of approx. 143 LF of existing waterline and one existing valve; installation of approx. 245 LF of 4" schedule 40 pvc waterline and 114 LF of 8" schedule 40 pvc waterline; installation of a precast underground vault; connections to the existing irrigation and waterline systems; and installation of a water truck fill station. Work includes removal of approx. 143 LF of existing waterline and one existing valve; installation of approx. 245 LF of 4" schedule 40 pvc waterline and 114 LF of 8" schedule 40 pvc waterline; installation of a precast underground vault; connections to the existing irrigation and waterline systems; and installation of a water truck fill station. See outside link.
FederalDC
Posted
Aug 4, 2026
Oct 29, 2026
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Decision makers connected to this RFP from Ozark Mountain School District.