Limestone County School District
School DistrictAL
Posted
-
Oct 20, 2026
Limestone County Schools Football Turf Replacement, Group 2
Work inlcudes football turf replacement.
Description: Group 1 bid packages include: 01F - Final clean; 07A - Roofing; 09C - Flooring (tile); 09D - Flooring (resilient and carpet); 09E - Acoustic ceilings and panels; 09G - Painting and wall coverings; 09H - Flooring (wood athletic flooring); 011A - Food service equipment; 011G - Theater and stage equipment. Group 2 bid packages include: 03A - Structural concrete; 04A - Masonry; 04B - CMU; 06B - Casework and millwork; 07E - Exterior siding (precast panels); 07F - Exterior siding (metal panels); 08A - Interior openings; 08D - Aluminum, glass, and curtain wall; 09A - Framing and drywall; 10Z - Misc specialties.
SchoolDistrict · WA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Limestone County School District
School DistrictAL
Posted
-
Oct 20, 2026
Work inlcudes football turf replacement.
Minnesota State University Moorhead
Higher EducationMN
Posted
May 22, 2026
Nov 3, 2026
Bid Package #1: The project includes installation of a new networked fire alarm system for the academic and administrative buildings on campus. Some of the buildings will have the present fire alarm system within the building networked into the new campus wide system. This bid package includes all of the fiberoptic cable for networking all buildings including academic, housing, Comstock Memorial Union and Wellness Center.
CityFL
Posted
Oct 8, 2026
Nov 10, 2026
Water main replacement. Scope of work includes - 70 SY concrete driveway restoration; 1 EA concrete stair restoration; 10 SY asphalt restoration; 100 SY mill and resurface; 10 LF curb and gutter restoration; 1,090 LF 3" DR-11 PE piping - water main (includes, excavation, installation, fittings, adapters, restraints, labor, equipment, etc.) via open cut; see attached file.
CityOH
Posted
-
Oct 29, 2026
Work inlcudes water main replacement.
Decision makers connected to this RFP from Renton School District 403.