CountyVA
Posted
Sep 22, 2026
Oct 16, 2026
Fire Station 8 Hvac Replacement RFP
Hvac replacement.
Description: The project involves the installation of a new City provided 12-inch flow meter, including purchase and installation of contractor supplied shop coated 12" ductile iron pipe, mega-flange(s), bolts, gaskets and fittings, electrical conduit and floor door (hatch) as detailed in these specifications and drawings.
City · MI, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyVA
Posted
Sep 22, 2026
Oct 16, 2026
Hvac replacement.
Hartford County Metropolitan District
Special DistrictCT
Posted
Oct 5, 2026
Nov 5, 2026
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the removal and replacement of twelve (12) flow meters and control systems, three (3) of which will also require the removal and installation of combined sewer overflow level sensors, and the removal and installation of seven (7) rain gauges and control systems along with technical support, support equipment, and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
Decision makers connected to this RFP from City of Kalamazoo.