CountyMS
Posted
Oct 11, 2026
Nov 12, 2026
Intersection Improvements RFP
Work inlcudes intersection improvements include construction of roundabout, widening, overlay, striping, and some drainage work.
Description: Work includes 18 SY removing concrete flumes, 253 LF removing curb and gutter, 2 EA removing inlets, 900 CY unclassified excavation, 197 CY borrow excavation (loose truckbed measurement)(a4 or better), 87 CY structure excavation, 13 CY foundation backfill, commercial, 135 Ton crushed aggregate, section 825, type b, for miscellaneous use, 13,895 SY planing existing pavement (approx 8.10" thru 9.0" thick), 1,847 SY planning existing pavement (approx 10.1" thru 11.0" thick), superpave bituminous concrete wearing surface layer, leveling, 3/4" maximum aggregate size mix, esal range c/d 50 Ton, 15,741 SY plain cement concrete pavement,12" thick. See attached file.
SpecialDistrict · AL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Alabama Department of Transportation.
Adjacent opportunities open for bidding right now.
CountyMS
Posted
Oct 11, 2026
Nov 12, 2026
Work inlcudes intersection improvements include construction of roundabout, widening, overlay, striping, and some drainage work.
CityTX
Posted
Oct 15, 2026
Nov 5, 2026
The City of Carrollton is soliciting bids for Josey Lane and Parker Road Intersection Improvements.
CityNJ
Posted
Oct 7, 2026
Oct 29, 2026
Millville is seeking bids for roadway improvements on Geissinger Avenue. The posting identifies the solicitation as COM BID # 2026-06 and lists it as open. Bids are due October 29, 2026, at 1:00 p.m.
CityNC
Posted
Oct 9, 2026
Nov 17, 2026
Project includes approx. 1,150 LF of 15" RC Pipe Culverts, Class III; 420 LF of 15" RC Pipe Culverts, Class IV; 1500 SF of Segmental Gravity Retaining Wall (Wall D); 6000 LF of 2'-6" Concrete Curb and Gutter.